
Projects » St. Luke's Hospital / Sutter Healthcare Systems
 |
 |
 |
| Job Type |
Medical Vacuum and Medical Air Replacement |
 |
| DESIGN TEAM |
 |
| Mechanical Engineer |
Oldham Engineering |
 |
| Electrical Engineer |
JRA Electrical Engineers, Inc. |
 |
| Structural Engineer |
James D. Hallam |
 |
| CONSTRUCTION TEAM |
 |
| Manager / General Contractor |
Advanced Engineering Sales dba bbc construction |
 |
| Mechanical Plumbing Contractor |
L.J. Kruse |
 |
| Electrical Contractor |
McClure Electric |
 |
| COMMENTS |
 |
| Replace existing medical air system main hospital and medical vacuum system located in the 57 building. |
 |
| |
 |
| Project Start Date |
March 4, 2004 |
 |
| Project # |
A04-2332 and A04-2621 |
 |
|